McNABB CONSTRUCTION COMPANY has completed hundreds of construction projects in the Denver area. We have developed long-term relationships with property owners, property managers and architects, leading to repeat business. Scott McNabb has operated the company for 50 years, as the sole owner.

 

Projects

Brumate

Hall Estill

7800 E. Dorado Pl. Replace Exterior

300 Plaza Dr. Restrooms

Fire Station #2, Evergreen

Residence, Lakewood

Homestead House, Aurora

Addition to terminal, Jet Center, Centennial Airport

Key Bank, Corporate Headquorters

200 Plaza Dr. Lobby Remodel

Trinity Place, 1801 Broadway, Lobby Remodel

Ethan Allen Gallery, Colorado Springs

Residence, Greenwood Village

Ethan Allen Gallery, Lakewood

,,Here is a partial list of completed work, which demonstrates our capabilities:

New Buildings

  • Ethan Allen Gallery, Lakewood 16,000 SF
  • Homestead House furniture store, Aurora 22,000 SF
  • Residence, Greenwood Village
  • Ethan Allen Gallery, Colorado Springs 15,000 SF
  • Fire Station #2, Evergreen, Colorado
  • Shopette, 1280 Grant, Denver, Colorado
  • Headquarters building and shop, Southgate Water & Sanitation District, Centennial, Colorado
  • Residence, Lakewood, design-build
  • Brake and Wheel Service Co (maintenance facility for concrete trucks), 30,000 SF, design build
  • Cattle hide pickling plant Denver, Colorado including a primary water treatment plant 17,000 SF completed on a time & material basis for the Japanese owner, Denkin
  • Pioneer Porsche Audi car dealership, 2950 S. Havana St., Aurora

Additions and Exterior Work

  • Remodel and additions to numerous homes in Bow Mar, Cherry Hills and Greenwood Village – Donald Roark, architect
  • Renovation of the Bonfils Mansion, Golden, CO. This 12-acre compound included two 8,000 SF homes. Our work included a detached 6-car garage, a 110,000 gallon underground concrete water storage tank with a water treatment plant, an underground gasoline tank with a gasoline pump, a spa, patios, fountains, updating and redecorating kitchens and baths in both homes, all respecting the 1930’s Spanish-style architecture.
  • Addition to Childrens Hospital for a data center, 18th and Downing (the original hospital)
  • Removal of the entire (1,000 lin. ft. x 35’ high) exterior skin of this 70,000 SF office building and installation of all new materials, 7800 E. Dorado Pl., Greenwood Village
  • Addition to Cousins Auto Parts, Denver, 3,000 SF
  • Addition to Jet Center terminal, Centennial Airport

Health Care

  • Childrens Hospital, 18th and Downing 1980 -1989.Numerous remodels in the medical office building and in the hospital, supervised by Adams Architects, including operating rooms, the mental health department, the oncology department, nuclear medicine lab, a cardiac catheterization lab, a dental surgery facility, the burn unit, and more.
  • Presbyterian Hospital, 1719 E. 19th Ave., Denver. Complete remodel of the Intensive Care Unit, & the recovery room, including partitions, finishes, electrical & mechanical work, while occupied and in use. Architect Haller & Larson. Complete remodel of the coronary care unit while occupied, and in use. Architect Haller & Larson. Main lobby remodel.
  • Open sided MRI, 5250 Leetsdale, Denver
  • Casement Dental, 1355 S. Colorado Blvd.,
  • Barbara Davis Center for Childhood Diabetes, 4495 Hale Parkway, Denver
  • Colorado Dermatology 3540 S. Poplar, 3,000 SF
  • Dental Pediatric Group, Eye Care Center and Pediatric Internal Medicine for Lillibridge Healthcare Services, 300 Exempla Circle, Lafayette, Colorado

Interior Remodeling

  • ADP 4725 Independence St. 10,000 SF. Numerous remodel projects, the largest being removal of 50% of the interior columns and bearing walls, and installation of new beams to support the roof; all work was performed while the building was occupied.
  • Beverage Distributors, Aurora, CO. Various construction projects inside of this 400,000 SF warehouse and office area, the largest being a 14,000 SF refrigerated beer cooler.
  • Mexican Consulate relocation 5350 Leetsdale Dr., Glendale 6,000 SF
  • 8000 and 7951 E. Maplewood, also the MCI Building, for Lowe Enterprises, Brett Welker
  • 55 Madison, Denver, for Real Property Systems

 Buildings in which we completed one or two tenant finish projects, and afterwards the building manager awarded all tenant finish work to McNabb Construction for as long as he/she managed the building;

  • Cherry Creek Plaza, 600 & 650 So Cherry. We remodeled every single suite in these twin 13-story office buildings, during a 19 year period (1987-2006) including lobbies, restrooms, and corridors. Owners – Pete Perry, Don Macy and Dutch Bansbach. Also, after the buildings were sold to the Trammell Crow Co, we continued to do all the tenant finish work for Judy Duran
  • Guaranty Bank 1331 17th St Denver, for Gary Daniels. All tenant finishes except the bank
  • Empire Park, 1325, 1355, 1385 S Colo Blvd, for John Pavlakovich
  • 501 S Cherry, CMD, for Chuck Knapton
  • 6855 S Havana St., the Rampart Building for USAA Realty, Kim Sohl
  • 1600 Stout Denver, for the Broe Co, Mike Geppert
  • 1700 Broadway, Denver, for the Broe Co, John Pavlakovich
  • Trinity Place 1801 Broadway, Denver for Lori Metcalf, Hank Brumley
  • 50 S. Steele, Denver, for Gaye Hoffman
  • Union Terrace, 12596 W Bayaud Ave, Lakewood, for Prime West, Margie Wright
  • 200 and 300 Plaza, Highlands Ranch, for Prime West, Margie Wright
  • Aurora Corporate Plaza 12200 E. Iliff Ave, Lowe Enterprises, Jennifer Furry
  • Graland School, Denver, for Bob Elisha
  • Triad Office Park, 5660, 5670, 5680 Greenwood Plaza Blvd, for PM Realty, Henry Rewun
  • 90 Madison, Denver for The Venture Group, Joe Serino, Tom Ditta, Richard Bryant